HomeCompaniesJeevy Fabrication

Jeevy Fabrication

AI Driven EPC - Weld Fabrication Contractor

Jeevy Fabrication is an AI-powered contractor that connects complex weld jobs to the best-fit shops—fast. We deliver top-tier QA and total transparency, all at better traditional outsourced pricing. Our software reduces bid and scheduling time for our in-network shops by over 80%. It converts manufacturing drawings into an accurate bill of materials and a resource-loaded, high-fidelity schedule—eliminating costly errors and rework. Using this our in-network fabricators can bid on more jobs and deliver more reliable results than their competitors. We also offer our clients a streamlined purchasing and project tracking experience. Clients submit purchase requests, track schedules, access key documents, and receive real-time photo updates—all in one place. We provide traceability for easy material review and maintenance of domestic content standards as required. Faster decisions, fewer delays, complete visibility.
Active Founders
Jeevesh Konuru
Jeevesh Konuru
Founder
SpaceX || MIT BS/MBA || Stanford MS || Sloan MBA Dropout Led team of 8 engineers at SpaceX for several years building cryogenic loading systems in South TX. During surge projects would manage large teams of welders/technicians. Managed $110M budget for design, procurement and build of the template design of the propellant loading system for Starship.
Vinay Konuru
Vinay Konuru
Founder
Rondo Energy | Stanford | Princeton - Personal engineer to Rondo Energy founder John O'Donnell, rapidly developed core technical analysis to support $30M+ project sales cycles - Dropped out of Stanford University Master's of Engineering - Top prize at Princeton Research Day 2023 for development of a desktop direct air carbon capture system
Company Launches
Jeevy Fabrication: The AI Fabrication Contractor
See original launch post

TLDR:

Jeevy Fabrication is a AI driven fabrication contractor for welded assemblies. We deliver higher quality QA and schedule transparency while maintaining competitive pricing.

https://www.youtube.com/watch?v=4lB7YAlHF1U

What we found:

If you are building rockets to Mars or fusion systems, getting complex welded assemblies built to spec, on time, and on budget is mission-critical—and incredibly hard.

Outsourcing to smaller weld shops can save money, but often at the cost of quality, schedule delays, and lost traceability. Precision assemblies often arrive dirty, out of spec, or late because these shops lack the project management horsepower needed to maintain the rigor high-stakes hardware demands.

Quick reality check: Processing one drawing properly—with a detailed schedule, test plan, and QA flow—takes ~9 hours. With only a 10% win rate on bids, a small shop could spend 90 hours just to land one job. That’s not scalable when you’ve got one or two engineers.

Our approach

We figured it would be awesome if we could offer the same high quality results of in-housing at the price of outsourcing a job. Our software reduces bid and scheduling time for our in-network shops by over 80%. It converts manufacturing drawings into an accurate bill of materials and a resource-loaded, high-fidelity schedule—eliminating costly errors and rework. Using these tools, our in-network fabricators can spend less time bidding and deliver more reliable results than their competitors. ‘

We handle the bids, purchase materials, and allocate jobs to shops in our network that have the right capabilities and available capacity. By owning the job end-to-end, we ensure quality and adherence to key project milestones. In-network shops benefit from smarter scheduling tools and a steady stream of work to fill their downtime.

About the Team

We’re brothers—and that’s a desktop DAC (Direct Air Capture) we built together as a side project. We’ve always known we’d start a company together—it’s been part of the plan for as long as we can remember. And we’ve always said it had to be a rock ’n’ roll fueled adventure!

Our dad was a serial entrepreneur, and dinner conversations were filled with stories and lessons from his ventures. That’s just how we grew up.

Jeevs: Spent several years at SpaceX designing and building welded assemblies for launch pads in South Texas. The genesis of this idea came from the pain Jeevs experienced while sourcing parts for launch critical systems. “...why is there water in my cryogenic liquid oxygen pipe?? It’s like they’re trying to kill us!”

Vinay: Several years of experience writing software for energy grid optimization projects. Worked at Rondo Energy designing and modeling grid scale heat batteries. He has a computer science and electrical degree from Princeton University.

Our ask

Need a welded part built? Know someone who does? Please let us know!

Jeevy Fabrication
Founded:2025
Batch:Spring 2025
Team Size:3
Status:
Active
Location:Cocoa, FL
Primary Partner:Diana Hu